Draft Swimming Pool Safety Program Policy

Share Draft Swimming Pool Safety Program Policy on Facebook Share Draft Swimming Pool Safety Program Policy on Twitter Share Draft Swimming Pool Safety Program Policy on Linkedin Email Draft Swimming Pool Safety Program Policy link

Consultation has concluded

A Draft Swimming Pool Safety Program Policy is on public exhibition. This policy outlines the inspection program relevant to all swimming pools that are situated, or proposed to be constructed, on premises where a residential building, a moveable dwelling, or tourist accommodation is located.

View the Draft Swimming Pool Safety Program Policy.

The 28-day public exhibition period is from 5 August 2024 to 2 September 2024.

Feedback will be received up until 5pm on 2 September 2024 via the below form.

A Draft Swimming Pool Safety Program Policy is on public exhibition. This policy outlines the inspection program relevant to all swimming pools that are situated, or proposed to be constructed, on premises where a residential building, a moveable dwelling, or tourist accommodation is located.

View the Draft Swimming Pool Safety Program Policy.

The 28-day public exhibition period is from 5 August 2024 to 2 September 2024.

Feedback will be received up until 5pm on 2 September 2024 via the below form.

  • CLOSED: This survey has concluded.

    Please provide your feedback on the Draft Swimming Pool Safety Program Policy by completing the form below.

    Consultation has concluded
    Share Have your say: Draft Swimming Pool Safety Program Policy on Facebook Share Have your say: Draft Swimming Pool Safety Program Policy on Twitter Share Have your say: Draft Swimming Pool Safety Program Policy on Linkedin Email Have your say: Draft Swimming Pool Safety Program Policy link